Issue Solved LLC |
|
CATV Network Upgrade, Testing, and Certification Management |

|
The services listed below are can be delivered on an a-la-carte basis, or as part of a full certification program. |
|
Service List |
|
Analyze an overall node for ingress, CPD, Laser clipping, or other problems. A short peak hold can allow the system to rank nodes according to severity of problems, and adjust budget accordingly |
|
Initial Ingress Testing |
|
By injecting a 16QAM signal at various end-of-line locations, level problems and ingress can both be analyzed prior to mitigation or sweep. If a node appears ‘clean’, final digital testing can be performed at the same time, from each EOL. |
|
Initial Digital Testing |
|
With an analog signal injected at various end of line locations, this test, with peak hold, is used as a QC check of ingress mitigation. |
|
Final Ingress Testing |
|
With 16QAM signal injected at EOL locations, a full node health report is created with MER, BER (pre-FEC), BER (post-FEC), Group delay, frequency response, Signal-to-noise, and signal-to-ingress, over time. |
|
Final Digital Testing |








|
Sweep and Ingress Management |
|
We can also provide Project Management of your sweep, ingress mitigation, or upgrade program as an independent 3rd party. |